Saturday, September 27, 2008
Thursday, September 18, 2008
Progress on the front porch
Wednesday, September 17, 2008
Ductwork everywhere
Well, after much fretting, heating and ductwork has been installed. We opted for a high-efficiency 95+ variable speed furance to keep us warm during the winter. Work already has begun on the front porch. And pressed concrete was poured into the mudroom last week. After the porch, mudroom and breakfast nook are framed, we expect to begin on electrical. And so it goes...
Tuesday, August 26, 2008
Plumbing!
Our plumbing has been roughed in. The plans call for 3 full baths -- master and kids' bathrooms on the second floor, and a guest bathroom on the first floor. In one photo, you can see plumbing for the kids' sink in the foreground and the bathtub in back. In the distance you can see the space for the master shower. The other photo is of the guest bathroom, which, in addition to sink, toilet and shower, will have a stacked washer/dryer. It's amazing what you can pack into a 50 sq ft space.
Friday, August 8, 2008
Progress
Lest anyone forget about our "other project," here are some photos of progress since our last post. The second floor is framed out, and stairs have been added from the main floor. Some kitchen windows were moved to make way for the anticipated sink and range, and you can see where a small pantry will be added. Siding started last week, but further work on the siding is on hold until the mudroom and front porch are built in a few weeks.
Wednesday, July 16, 2008
Thursday, June 26, 2008
We are dried in
Roofing was completed last week, and they've begun framing out the second floor. At some point, we'll be able to see the outline of three bedrooms and two baths upstairs. The first floor remains a different story -- at present, it's essentially one big room, with a small bedroom on the side. Windows are being ordered, to be installed at some later date.
Subscribe to:
Posts (Atom)