Thursday, June 26, 2008

We are dried in




Roofing was completed last week, and they've begun framing out the second floor. At some point, we'll be able to see the outline of three bedrooms and two baths upstairs. The first floor remains a different story -- at present, it's essentially one big room, with a small bedroom on the side. Windows are being ordered, to be installed at some later date.

No comments: