Lest anyone forget about our "other project," here are some photos of progress since our last post. The second floor is framed out, and stairs have been added from the main floor. Some kitchen windows were moved to make way for the anticipated sink and range, and you can see where a small pantry will be added. Siding started last week, but further work on the siding is on hold until the mudroom and front porch are built in a few weeks.
Friday, August 8, 2008
Wednesday, July 16, 2008
Thursday, June 26, 2008
We are dried in
Roofing was completed last week, and they've begun framing out the second floor. At some point, we'll be able to see the outline of three bedrooms and two baths upstairs. The first floor remains a different story -- at present, it's essentially one big room, with a small bedroom on the side. Windows are being ordered, to be installed at some later date.
Sunday, June 15, 2008
Last minute skylights
Wednesday, June 4, 2008
Forgot to mention...
We forgot to mention that the facade of the house will look dramatically different in a few weeks. We will be adding an old-style front porch that runs the length of the front of the house -- 36 feet long. To the left of the front door (in front of the mudroom and breakfast nook), it will be 5 feet deep. To the right of the door (in front of the living room), it will be 13 feet deep. We intend to use the porch as our outdoor entertaining space (in addition to our garden in the back).
The trusses are up!
The crew took advantage of the damp days to assemble the front and back walls of our second floor, and stowed the walls flat underneath the tarp until a break in the weather pattern. Today, they made the decision to go for it. In a single day, they lifted the front and back frames into place, affixed the trusses and set plywood on half the back half of the roof. Frightening to think how far along we would be if the weather had been good these past few weeks. If the weather holds, they hope to lay plywood on the front half tomorrow before framing out the sides and beginning work on the inside of the
house.
Slow moving
We had a new foundation poured for the mudroom and breakfast nook. To the left of the photos will be the ground-level entry into the mudroom, the floor of which will be either slate or stamped concrete. To the right will be the breakfast nook, which will be set higher up on the foundation. We've also included a photo of the 80 year-old backing to our coved ceilings, which we are losing as part of the project. We have been cursed with unpredictable weather, and have not witnessed two consecutive days with
out rain for quite a while.